Hoai An solid waste dumps
- Objectives of the project: To ensure the waste collection in Tang Bat Ho town, three industrial zones of Truong Soi, Du Tu and Go Loi, and neighboring communes. To improve ecological environment in this area.
- Estimated funding of the project: 64 billion VND.
+ ODA funding: 60.8 billion VND.
+ Contribution funding: 3.2 billion VND.
- Project location: An Tuong Dong commune.