Building the waste processing system in industrial clusters
- Objectives of the project: The waste in industrial clusters will be collected and processed to attain the requirements before discharging into the environment.
- Project location: Industrial clusters have put into operation but have not set up waste processing systems, including Bong Son Industrial Cluster, Binh Duong Industrial Cluster, Go Mit Industrial Cluster, Hoc Bom Industrial Cluster, Doc Truong Soi Industrial Cluster, etc.
- Estimated funding of the project: 60 billion VND.
+ ODA funding: 50 billion VND.
+ Contribution funding: 10 billion VND.