Hoc Sau Reservoir
- Objectives of the project: To supply the irrigation water for production. To prevent the flood to ensure the safety for downstream localities.
- Estimated funding of the project: 30 billion VND
+ ODA funding: 28 billion VND
+ Contribution funding: 2 billion VND
- Project location: Hoai An district