Interior drainage system in Phu Phong town
- Objectives of the project: To build the interior drainage system of Phu Phong town. To gradually complete the town infrastructure, contributing to protecting the environment and enhancing the local people’s lives.
- Estimated funding of the project: 20 billion VND.
+ ODA funding: 18 billion VND.
+ Contribution funding (if required): 2 billion VND
- Project location: Phu Phong town, Tay Son district, Binh Dinh province.