- Objectives of the project: To build the road so as to facilitate the transport of local people’s agricultural products. This also contributes to the socio-economic development for the project-based localities.
- Estimated funding of the project: 14.1 billion VND.
+ ODA funding: 13 billion VND.
+ Contribution funding (if required): 1.1 billion VND
- Project location: in the northwest of Vinh Thanh district.