Building the dike to prevent the erosion of Kon River from Ba 5 waterfall to Vinh Thinh Agricultural Co-operative
- Objectives of the project: To prevent the landslide and erosion of the land which affects the local households along Kon River
- Estimated funding of the project: 6 billion VND.
+ ODA funding: 6 billion VND.
- Project location: An Ngoai hamlet, Vinh Thinh commune, Vinh Thanh district.