Researching and adjusting An Du valve (taking into coping with climate change)
- Objectives of the project: To protect the river banks and prevent the erosion. To stabilize the locality of new seaport and ensure the local people’s lives and their possessions. To prevent the food and ensure the drainage effectively for the Lai Giang valley.
- Estimated funding of the project:
+ ODA funding: 630 billion VND.
- Project location: Hoai Nhon district.