The infrastructure of De Gi salt (phase 2)

- Objectives of the project: To improve the condition and production progress. To increase the productivity and output, and (to) reduce the production. To contribute to the poverty reduction and develop the economy for the households in 4 communes who produce the salt along the De Gi lagoon. To widen the flood drainage capability and reduce damages due to the flood in the upstream areas.

- Estimated funding of the project: 70.4 billion VND.

           + ODA funding: 57.5 billion VND.

           + Contribution funding: 12.9 billion VND

- Project location: My Thanh, My Chanh, My Cat communes (Phu My district), and Cat Minh commune (Phu Cat district).