Repairing and upgrading Thap Mao water-raising dam
- Objectives of the project: To build the new water-raising dam to replace the damaged old one. To increase the flood drainage and ensure the safety for the dam, cooperated with the irrigation.
- Estimated funding of the project: 40 billion VND.
+ ODA funding: 37 billion VND.
+ Contribution funding: 3 billion VND
- Project location: An Nhon town.