A- A A+ | Tăng tương phản Giảm tương phản

Repairing and upgrading Thap Mao water-raising dam

- Objectives of the project: To build the new water-raising dam to replace the damaged old one. To increase the flood drainage and ensure the safety for the dam, cooperated with the irrigation.

- Estimated funding of the project: 40 billion VND.

           + ODA funding: 37 billion VND.

           + Contribution funding: 3 billion VND

- Project location: An Nhon town.


Related news

Hot news Hot news