Repairing and upgrading An Thuan water-raising dam
- Objectives of the project: To increase the flood drainage, to ensure the safety for dam system cooperated with the irrigation. To prevent the consolidation and erosion in downstream areas and prevent the salinization.
- Estimated funding of the project: 40 billion VND.
+ ODA funding: 37 billion VND.
+ Contribution funding: 3 billion VND
- Project location: Tuy Phuoc district.