Xa Mao dike
- Objectives of the project: To prevent the flood; to ensure the safety for households living along the dam and their possessions. To ensure not losing the production land. To reduce the cost for the annual erosion of the dike.
- Estimated funding of the project: 25 billion VND.
+ ODA funding: 25 billion VND.
- Project location: Cat Tai commune, Phu Cat district.