Xa Mao dike

- Objectives of the project: To prevent the flood; to ensure the safety for households living along the dam and their possessions. To ensure not losing the production land. To reduce the cost for the annual erosion of the dike.

- Estimated funding of the project: 25 billion VND.

           + ODA funding: 25 billion VND.

- Project location: Cat Tai commune, Phu Cat district.