Repairing and upgrading Duc Pho water-raising dam

- Objectives of the project: To prevent saltwater instrusion; to irrigate 300 hectares of cultivated land and 118 hectares of aquaculture land. To enhance the flood drainage capability and prevent the waterlogging. To link the transport.

- Estimated funding of the project: 135 billion VND.

           + ODA funding: 135 billion VND.

- Project location: Cat Minh commune, Phu Cat district.