Repairing and upgrading Duc Pho water-raising dam
- Objectives of the project: To prevent saltwater instrusion; to irrigate 300 hectares of cultivated land and 118 hectares of aquaculture land. To enhance the flood drainage capability and prevent the waterlogging. To link the transport.
- Estimated funding of the project: 135 billion VND.
+ ODA funding: 135 billion VND.
- Project location: Cat Minh commune, Phu Cat district.