A- A A+ | Tăng tương phản Giảm tương phản

Repairing and upgrading Nha Phu water-raising dam

- Objectives of the project: To increase the flood drainage, to ensure the safety for dam system cooperated with the irrigation. To prevent the consolidation and erosion in downstream areas and prevent the salinization.

- Estimated funding of the project: 50 billion VND.

           + ODA funding: 45 billion VND.

           + Contribution funding: 5 billion VND

- Project location: Tuy Phuoc district.


Related news

Hot news Hot news