Repairing and upgrading Nui Mieu reservoir in My Loi commune
- Objectives of the project: To ensure the accumulation and regulation of the water so as to irrigate 135 hectares of agricultural cultivated land. To prevent the erosion and consolidation in downstream areas; to prevent the flood and improve the groundwater condition.
- Estimated funding of the project: 35.63 billion VND.
+ ODA funding: 35.63 billion VND.
- Project location: My Loi commune, Phu My district.