Repairing and upgrading Lao Tam water-raising dam
- Objectives of the project: To increase the flood drainage and ensure the safety for dam system, cooperated with the irrigation. To prevent the consolidation and erosion in downstream areas.
- Estimated funding of the project: 120 billion VND.
+ ODA funding: 112 billion VND.
+ Contribution funding: 8 billion VND.
- Project location: Phu Cat district.