Repairing and upgrading Lao Tam water-raising dam

- Objectives of the project: To increase the flood drainage and ensure the safety for dam system, cooperated with the irrigation. To prevent the consolidation and erosion in downstream areas.

- Estimated funding of the project: 120 billion VND.

           + ODA funding: 112 billion VND.

           + Contribution funding: 8 billion VND.

- Project location: Phu Cat district.