Improving and upgrading the capacity of Quy Nhon water distribution system, phase 2011-2015
- Objectives of the project: To ensure the water loss rate of Quy Nhon water supply and drainage system up to 2015 less than 20% and the usage of water tap in the city reaches 99% and outside the city with 80%. To increase the output capacity of the water supply system to ensure the safe water supply and quality.
- Estimated funding of the project: 1199 billion VND.
+ ODA funding: 1079.1 billion VND.
+ Contribution funding: 119.9 billion VND
- Project location: Quy Nhon city.